Kneading method

2features

If the inclination angle is 30 degrees or more, there is a risk that the transparent lump soil will flow out when watering with the normal shower method. Therefore, prevent outflow by kneading with water in advance with a mortar mixer or the like.

The strength will be higher than that of the normal shower method.

Construction procedure

※1

Mixing ratio: Moisture content approx. 16% -18% / Soil 25kg (1 bag): Water 4kg (4ℓ) -4.5kg (4ℓ)
Kneading time ・ ・ ・ Approximately 5 minutes
* When kneading, it is easy to get lumps, so please loosen it by hand from time to time.
* Please consider the amount of water during periods of intense drying.
* Please mix antifreeze for winter construction.